DBIA-MN | Summer Project Tour
About this Event
Please join us for a tour of the I-494 Reconstruction Design-Build Phase 1 project by the design-builder, C.S. McCrossan. The project entailed constructing an E-Z Pass in both directions between East Bush Lake Road and I35W, a turbine interchange at I494 and I35W, and a reconfiguration of the access at Nicollet, Portland, and 12th Avenues. The project also included the construction of a new pedestrian bridge at Chicago Avenue, vehicular bridges, retaining walls, noise walls, drainage infrastructure, etc.
Tour: 3:00-4:00PM
Social (following tour): 4:00-5:30PM
Meet at 494 Project Office:
(In the lobby outside Wally’s Roast Beef)
8120 Penn Ave S, Bloomington MN 55431
Lucky’s 13 Pub
1800 American Blvd W, Bloomington MN 55431
Where is it happening?
Event Location & Nearby Stays:
USD 12.80








