SH 99 Grand Parkway, Segment B-1 Open House
Advertisement
The City of Alvin invites you to an open house with guest speakers from the TxDOT and Ferrovial Construction-Webber project team delivering the SH 99 Grand Parkway, Segment B-1 project.
About the Project: SH 99 Grand Parkway Segment B-1 includes four new SH 99 tolled lanes, two in each direction, for approximately 14 miles from FM 646 to south of FM 2403. Additional Improvements include two direct connectors at the SH 35 interchange, discontinuous frontage roads from I-45 to SH 35, and approximately 6 miles of non-tolled operational improvements to SH 35. Learn more about the SH99 Grand Parkway Project at https://www.txdot.gov/sh99-segment-b1.html
Date: November 12, 2026
Time 6:00 PM
Location: Harby Junior High Cafeteria (1500 Heights Road, Alvin TX 77511)
For more information, contact Paul Chavez at (281) 388-4281 or at [email protected].
About the Project: SH 99 Grand Parkway Segment B-1 includes four new SH 99 tolled lanes, two in each direction, for approximately 14 miles from FM 646 to south of FM 2403. Additional Improvements include two direct connectors at the SH 35 interchange, discontinuous frontage roads from I-45 to SH 35, and approximately 6 miles of non-tolled operational improvements to SH 35. Learn more about the SH99 Grand Parkway Project at https://www.txdot.gov/sh99-segment-b1.html
Date: November 12, 2026
Time 6:00 PM
Location: Harby Junior High Cafeteria (1500 Heights Road, Alvin TX 77511)
For more information, contact Paul Chavez at (281) 388-4281 or at [email protected].
Advertisement
Where is it happening?
Harby Junior High, 1500 Heights Rd, Alvin, TX 77511-7629, United States
Event Location & Nearby Stays:
Know what’s Happening Next — before everyone else does.
Host or PublisherCity of Alvin - Government






