ODOT Matchmaker- District 9
Schedule
Wed Nov 13 2024 at 02:30 pm to 06:00 pm
UTC-05:00Location
Christopher Conference Center, 20 North Plaza Boulevard, Chillicothe, Ohio 45601 | Chillicothe, OH
About this Event
The Ohio Department of Transportation will host matchmaker and project overview of:
- LAW-7-2.17 Phase 2 (PID 75923) (New Roadway, valued at $162 million, Letting date- 12/12/24).
Description: Construct one lane in each direction of the proposed Chesapeake Bypass (State Route 7) from the interchange of State Route 7 and State Route 527 eastward to a new interchange with State Route 775. Project length is 6.1 miles, has 10 bridges, a retaining wall, noise walls and approximately 5 million CY excavation.
and
- ROS-159-0.41 (PID 113013) Roadway Improvement- Safety, valued at $20.2 million, Letting Date- 2/13/25).
Description: Improvements to ROS 159 (Bridge Street & US 35 EB Ramp) to address crash patterns and congestion. Improvements include adding a third NB through lane, adding connecting side streets to improve signal level of service, lane reassignments, and ramp drop lane entrance at the ROS-159 SB to US 35 WB on-ramp as well as improving the US 35 EB off-ramp to realign with ROS-159 to minimize queue length. Pedestrian facilities will also be added along the corridor.
Registration begins at 2:00pm and walk-ins will be accepted.
The Matchmaker appointments will start at 2:30pm, which will allow DBE Firms to meet with Prime Contractors in one-on-one appointments in 15-minute intervals and introduce the services they can provide and discuss opportunities on how to work together to meet project goals.
ODOT promotes access to our meetings and trainings. To request a reasonable accommodation for this event due to a disability, please contact the meeting organizer listed above at least 3 days prior to the event (if possible).
Where is it happening?
Christopher Conference Center, 20 North Plaza Boulevard, Chillicothe, Ohio 45601, United StatesEvent Location & Nearby Stays:
USD 0.00