I-35 Northeast Expansion (NEX) South Project Opportunities (IN-PERSON)

Schedule

Wed Feb 08 2023 at 04:00 pm to 06:00 pm

Location

Event address in San Antonio, TX | San Antonio, TX

Advertisement
Join Lone Star Constructors for this IN-PERSON informational event for the upcoming I-35 NEX South Project.
About this Event
PROJECT DESCRIPTION

The project is approximately 4 miles of non-tolled improvements along I-35 from the I-35/I-410 South interchange to I-35/I-410 North interchange, including a portion of I-35 elevated lanes south and the I-35/I-410 South interchange. Project is located in San Antonio, TX.


DBE CONTRACT OPPORTUNITIES FOR THIS PROJECT:
  • Aggregates
  • Asphalt Milling
  • Asphalt Paving
  • Bridge Construction
  • Cast-in-Place Concrete Barrier and Rails
  • Clearing
  • Concrete Flatwork
  • Concrete Painting
  • Concrete Ready Mix Supply
  • Concrete Sawing/Demo
  • Drainage Installation and Material Supply
  • Drilled Shafts
  • Electrical/Illumination/ITS and Signal
  • Erosion Control
  • Excavation
  • Fencing
  • Fuel Supply
  • Furnish/Install Reinforcing Steel
  • Guardrail/Attenuators
  • Large/Small Signs
  • Liquid Asphalt Supply
  • Material Hauling
  • MSE Walls
  • Pavement Markings & Striping
  • Post-Tensioning
  • Pot Holing/Hydro Excavation
  • Professional Services
  • Soil Nail
  • Supplier Services
  • Sweeping Services
  • Traffic Control Services
  • Trucking
  • Video Inspection and Cleaning of Pipe

Elements of the work include:
  • Construction of two general purpose and one high-occupancy (HOV) elevated lanes in each direction from the I-35/I-410 South interchange to I-35/I-410 North interchange along I-35, with HOV lane drops in the vicinity of I-35/I-410 South interchange and I-35/I-410 North interchange to allow entering and exiting the HOV lane.
  • Construction of two lane extensions of the elevated lanes south of the I-35/I-410 South interchange to accommodate future southern extension of the elevated lanes, and two-lane direct connectors in two directions along I-410 at the I-35/I-410 South interchange.
  • Operational improvements, including the construction of ramps connecting main lanes to elevated lanes and reconfiguration of main lane ramps, reconstruction of approximately 300 feet of main lanes along I-410 South and reconstruction of the I-35 main lanes inside shoulder.

I-35 NEX SOUTH PROJECT MAP
Event Photos
CONTACT INFORMATION
[email protected] (For Suppliers and Subs submitting company information to receive bid packages)

[email protected] (For Supplier and Subs submitting quotes or asking questions regarding a bid package)
Advertisement

Where is it happening?

Event address in San Antonio, TX, PROVIDED WITH REGISTRATION CONFIRMATION, San Antonio, United States

Event Location & Nearby Stays:

Tickets

USD 0.00

Lone Star Constructors

Host or Publisher Lone Star Constructors

It's more fun with friends. Share with friends