Cooling Tower and Chiller Plant Piping Seminar - Durham, NC

Schedule

Thu Nov 03 2022 at 08:00 am to 03:00 pm

Location

North Carolina Biotechnology Center | Durham, NC

Advertisement
Seminar is from 8:00 AM to 3:00 PM. An on-site luncheon will be provided. There is no charge for the seminar or luncheon.
About this Event

This seminar takes an in-depth look at how to properly design a condenser water system. Below is an outline of what will be covered.

  • Cooling Tower Application Considerations
  • Why Cooling Towers?
  • Cooling Tower Application Considerations
  • Multiple Towers & Condensers
  • Cooling Tower Systems
  • Pipe Sizing & Design
  • Cooling Tower System Balance
  • Head Pressure Control
  • Cooling Tower Water Conditioning For
  • Cooling Tower Pitfalls
  • Concrete Basin Applications
  • Cooling Tower Fan Controls
  • Cooling Tower System Energy Reduction
  • Evaporator & Distribution Piping Systems
  • General Energy Plant Control & kW Optimization

The instructors will be Chris Edmondson, CEO of JMP Equipment Company and ASHRAE Distinguished Lecturer, and Chris Norwood, VP of Sales of JMP Equipment Company. A certificate of attendance for six (6) Professional Development Hours will be provided.


Want to learn more? Visit the JMP Study Hall.
Event Photos
Advertisement

Where is it happening?

North Carolina Biotechnology Center, 15 TW Alexander Drive, Durham, United States

Event Location & Nearby Stays:

Tickets

USD 0.00

JMP Equipment Company

Host or Publisher JMP Equipment Company

It's more fun with friends. Share with friends