Cooling Tower and Chiller Plant Piping

Schedule

Tue Aug 11 2026 at 08:00 am to 12:00 pm

UTC-05:00
Location

Embassy Suites by Hilton Nashville Airport | Nashville, TN

Advertisement
Seminar is from 8:00 AM to 12:00 PM. An on-site luncheon will be provided. There is no charge for the seminar or luncheon.
About this Event

This seminar takes an in-depth look at how to properly design a condenser water system. Below is an outline of what will be covered.

  • Why are cooling towers used in HVAC systems?
  • How to pick/design a cooling tower, including overview cooling tower types, materials of construction, pumping design, and more
  • Cooling tower fan control - considerations and limitations
  • Designing multi-tower and multi-condenser systems
  • Water side economizers
  • Pipe sizing and design
  • Avoiding cooling tower pitfalls
  • And more!

The instructors will be Chris Norwood, VP of JMP and Will Berlik, Engineering Sales Specialist of JMP. A certificate of attendance for four (4) Professional Development Hours will be provided.




Want to learn more? Visit the JMP Study Hall.
Advertisement

Where is it happening?

Embassy Suites by Hilton Nashville Airport, 10 Century Blvd, Nashville, United States

Event Location & Nearby Stays:

Tickets

USD 0.00

Know what’s Happening Next — before everyone else does.
JMP Equipment Company
Host or PublisherJMP Equipment Company

Ask AI if this event suits you