ASHE NCNJ and ASCE NJB TTG Presentation: January 2025
Schedule
Thu Jan 09 2025 at 05:30 pm to 09:00 pm
UTC-05:00Location
Sheraton Parsippany Hotel | Parsippany-Troy Hills, NJ
About this Event
ASHE NCNJ and ASCE NJB Transportation Technical Group (TTG) Present:
"Missing Moves: Making Connections to Alleviate Congestion"
Presented by:
Kirtesh Ladwa, PE – Senior Associate, Deputy Department Manager - Dewberry
Registration & Reception: 5:30-6:30
Dinner at 6:30 with presentation to follow
The NJDOT’s evaluation of the Route 295/42/I-76 Interchange identified several operational deficiencies, including the lack of direct connection between Routes 295 and 42. As a result, motorists wanting to make these movements had to travel into the interchange and utilize the local roadway network, increasing congestion on what is already one of the largest and most congested roadways in southern NJ. The $180 million Route 295/42, Missing Moves, Bellmawr Project eliminated this deficiency by constructing ramps linking Route 295 with Route 42, enhancing traffic flow within the adjacent Interchange, improving safety, and alleviating traffic congestion on the local roads. The presentation will highlight the contribution of multiple technical disciplines which addressed the challenges encountered in the design and construction of two new ramps, each exceeding a half-mile in length, within an urban and environmentally constrained site.
This program is pending approval for 1 PDH for NY and NJ PEs.
Please reserve your tickets here at eventbrite! You may pay online with credit card or you may opt to pay by check.
Make checks payable to "ASCE North Jersey Branch" and bring to the event or mail in advance to:
Rob Rogoff - ASCE NJB Treasurer
HNTB
9 Entin Road, Suite 202
Parsippany, NJ 07054
Where is it happening?
Sheraton Parsippany Hotel, 199 Smith Road, Parsippany-Troy Hills, United StatesEvent Location & Nearby Stays:
USD 0.00 to USD 115.00